Omanisation
Established in 2009, BAUER NIMR LLC is an Oman-based environmental engineering company, owned by TANMIA, Allied Energy International and BAUER Germany. Since its establishment, the company has worked with Petroleum Development Oman (PDO) as a strategic partner, beginning with the development of the Nimr Water Treatment Plant (NWTP), the world's largest commercial constructed wetland treatment system. What began as a pioneering project in sustainable produced water treatment has evolved into a broader portfolio of environmental solutions, including constructed wetlands, modular wastewater treatment technologies and research and development. Combining German engineering expertise with local knowledge, BAUER NIMR LLC continues to deliver practical, innovative solutions that support environmental protection, resource efficiency and sustainable development in Oman and the wider region. Through this work, BAUER NIMR LLC contributes to Oman Vision 2040 by supporting a more sustainable future, strengthening local capabilities and advancing environmental innovation.
Years of operations
Nimr development phases
Mobile sewage treatment plant units































Cumulative produced water treated

Cumulative emissions reduction

Design treatment capacity

Recorded at the Nimr wetlands

690M+
m³ of produced water treated
From the start of operations in December 2010 to August 2026, the Nimr Water Treatment Plant treated approximately 690 million m³ of water brought to the surface during oil production.
Rather than relying on conventional deep-well disposal, the plant uses a surface-based treatment system. Residual oil is separated and recovered before the water flows through vast constructed wetlands, where vegetation and microorganisms help remove remaining hydrocarbons.
From January to August 2026, the plant treated an average of more than 155,000 m³/day.

2.23M
tonnes CO₂
Traditionally, produced water from oilfields is pumped into deep underground disposal wells, requiring considerable energy.
At Nimr, BAUER NIMR LLC adopted a different approach. After initial oil separation, water travels through the constructed wetlands by gravity, significantly reducing the energy required for water management compared with deep-well disposal.
This nature-based approach has contributed to an estimated cumulative emissions reduction of 2.23 million tonnes of CO₂ as of August 2026. The project's technical assessment also reports potential annual reductions of up to 225,000 tonnes of CO₂ compared with deep-well disposal.
1.275M
2.23M
4.5M
2021
2026
2044 (projected)
Each bar is the total CO₂ avoided up to that point. 2021: after the plant's first ten years of operation. 2026: up to August 2026. 2044: BAUER NIMR's projected total.
175,000
m³/day
The Nimr Water Treatment Plant has expanded considerably since its first phase began operating in December 2010.
The original facility was designed to treat 45,000 m³/day of produced water. Further expansions increased capacity to 95,000 m³/day in September 2012 (Phase 2) and 115,000 m³/day in January 2015 (Phase 2 extension).
With the completion of Phase 3 in May 2019, the plant reached a total design treatment capacity of 175,000 m³/day.
Today, the facility encompasses approximately 480 hectares of constructed wetlands and 780 hectares of evaporation ponds, making it the world's largest commercial constructed wetland treatment system.

120+
bird species
What began as an engineered treatment site has also become a thriving habitat. Today, the Nimr wetlands support more than 120 recorded bird species, along with a variety of other wildlife observed around the site.
The species below are among those photographed at the Nimr Water Treatment Plant.

Greater flamingo

White stork

Arabian red fox

Pipit

Marsh sandpiper

Pratincole
BAUER NIMR LLC brings together engineers, environmental specialists and operational teams working across water treatment and environmental services. From our offices in Muscat to our operations at Nimr, our work depends on the experience and dedication of the people behind it.
Expertise across wetland engineering, business development, plant management, operations, finance, procurement, digital transformation, HSE and quality compliance.

Operations Support Manager

Head of Finance

NWTP Plant Manager

Quality Compliance Manager

Procurement Officer

Ministry of Transport, Communication and Information Technology
Ulrich Emmer, Managing Director

Oman Climate Week 2026
Usama Al-Affani, Operations Lead

Oman Meteorite Monitoring Project
Younis Al-Rawahi, Deputy Managing Director

Oman Society of Engineers, 5th Salalah Engineering Forum